Kunio Kakuta
Representative director, president
October, 1945 | The factory for manufacturing machine and utensil parts and farm appliances under private management was founded in Takinogawa-cho, Kita-ku, Tokyo, and manufacture was started. |
---|---|
September, 1949 | The organization was changed to a limited partnership was started. |
December, 1950 | For extending the equipment, the factory was moved to Shimura, Itabashi-ku, and the precision forging of automobile and motorcycle parts was promoted. |
January, 1951 | The change to a joint stock company was carried out. |
March, 1953 | By taking over the adjoining factory, the head office and the factory were extended. |
March, 1961 | Saitama Plant was newly constructed at 1003, fujikubo, Miyoshi-machi, Iruma-gun, Saitama prefecture. |
October, 1964 | Tokyo Plant was moved and integrated to Saitama Plant. The rationalization of synthetic equipment and the additional installation in the new factory were advanced, and the system of increased production was started. |
May, 1966 | The capital was increased to 45,000,000 yen. |
September, 1967 | No.1 1600 ton forging press was newly installed. |
May, 1969 | No.2 1600 ton forging press was newly installed. |
January, 1972 | The company was designated to Itabashi best report juridical person. |
June, 1972 | A 3000 ton forging press was newly installed. |
March, 1975 | No.3 1600 ton forging press was newly installed. |
September, 1977 | 154,000V special high voltage substation was newly installed, and electric power receiving facility was completed. |
October, 1977 | A 4500 ton forging press was newly installed. Designated to the factory for technical inspection in The 9th International Forging Congress and the representatives of various countries come to our company. |
March, 1979 | Ion nitriding equipment 2 ton furnace was newly installed. |
November, 1979 | Commended as the best management rationalization factory by the governor of Saitama prefecture. |
April, 1981 | Designated to a Saitama prefecture Standard factory. |
October, 1981 | A 2500 ton forging press was newly installed. |
January, 1982 | No.2 4500 ton forging press was newly installed. |
June, 1982 | Became an energy control designated factory of Tokyo Bureau of International Trade and Industry. |
March, 1983 | The company was awarded the Small and Medium Enterprises Agency Director prize (a best management rationalization factory) |
October, 1984 | The land for Kodama Industrial Park,in Kamikawa-machi, Kodama-gun, Saitama prefecture. |
November, 1984 | The capital was increased to 97,500,000 yen. |
July, 1986 | A three-dimensional transfer feeder was installed to the 2500 ton forging press. |
December, 1986 | The 600 kW high frequency induction heating furnace for the 2500 ton forging press was augmented to 900 kW. |
March, 1990 | The integrated line with continuous normalizing furnace, shot blast and automatic inspection was installed to No.2 4500 ton forging press. |
February, 1993 | No.3 4500 ton forging press was newly installed. |
August, 1997 | A 2000 ton forging automatic press was newly installed. |
March, 2000 | No.3 4500 ton forging press was converted to automatic with transfer bars. |
February, 2001 | Registrated for its Environmental Management System under ISO 14001:1996 (JIS Q 14001:1996) Machining center No.1 was installed in Die Shop. |
April, 2002 | The 2000 kW induction heater for No.2 4500 ton forging press line was newly installed. |
November, 2002 | Registrated for its Quality Management System under ISO 9001:2008 (JIS Q 9001:2008) |
March, 2003 | A 1000 ton billet shear was newly installed. |
July, 2004 | No.2 4500 to forging press was converted to automatic with transfer bars. |
April, 2005 | Designated to the factory for technical inspection in The 18th International Forging Congress. The billet heater of No.1 4500 ton press line replaced. |
October, 2007 | 154,000 V special high voltage substation was renewed. Machining center No.2 was installed in Die Shop. 240 kW and 280 kW compressors were installed. |
February, 2009 | The billet heater of No.3 1600 ton press line was replaced to 500 kW. |
October, 2013 | New factory where 5000 ton press line having all the processes from bar material to shipping is installed is built in Misato Machi in Saitama Prefecture. |